G4 Innovations
G4ORCE

Installing G4ORCE

Install Step 1
Step 1Install standard toilet flange and overflow flange.
(overflow flange and dimensions provided)
Step 2 Install standard main piping and overflow piping from standard 1” PVC.
Install Step 3
Step 3 Install rubber nipple to bottom of toilet. Install wax ring, align rubber nipple into the overflow flange and set. Note: Apply a liberal amount of silicone sealant to toilet and floor side of neoprene sponge.
Install Step 5
Step 4 Install flexible plastic grate into overflow hole.